ABCB (Australian Building Codes Board)
The ABCB (Australian Building Codes Board) is the body that writes and publishes the NCC, a joint Commonwealth and state initiative. What it does for builders.
Ask Chalkline about this →The ABCB (Australian Building Codes Board) is the body that develops and publishes the National Construction Code (NCC). It is a joint initiative of the Australian Government and the state and territory governments, working with the building industry, and it is the source every builder ultimately relies on for the technical rules of construction.
What it produces
The ABCB writes and maintains:
- The NCC itself, in three volumes: Volume One and Volume Two (the Building Code of Australia) and Volume Three (the Plumbing Code of Australia). See NCC structure.
- The ABCB Housing Provisions Standard, the deemed-to-satisfy companion that carries the detailed numbers for Class 1 and Class 10 work.
- Guidance, handbooks, and the CodeMark product-certification scheme.
It also sets the NCC’s three-yearly edition cycle; the states and territories then choose when to adopt each edition (see NCC version transitions).
Free access
A practical point: the ABCB provides free online access to the NCC and the Housing Provisions at ncc.abcb.gov.au (after a free registration). You do not need to buy the building code. The referenced Australian Standards (AS/AS-NZS) are a separate matter, those are published by Standards Australia and are mostly paywalled.
For a builder
- The ABCB writes the rules; the states enforce them. The Board produces the NCC, but it is adopted and administered under each state’s building legislation, and your certifier applies the edition in force locally.
- Get the code from the source. Use the free ncc.abcb.gov.au copy of the current adopted edition rather than an out-of-date PDF floating around.
- The ABCB is not your regulator. It does not license builders, issue approvals, or inspect; that is the state building authority and your certifier. The ABCB just writes the code.
Also known as: Australian Building Codes Board.
Related
- NCC (National Construction Code)
- ABCB Housing Provisions Standard
- NCC structure: BCA and PCA
- CodeMark
See also
Last updated: 2026-05-25. Verified: 2026-05-25. Quarterly review for currency.