glossary Glossary 1 min read

ABCB Housing Provisions Standard

The ABCB Housing Provisions is the standalone DTS document referenced from NCC 2022 Volume Two Section H. Holds the actual numbers builders use to comply.

Ask Chalkline about this →

The standalone Australian Building Codes Board document that holds the Deemed-to-Satisfy detail referenced from NCC 2022 Volume Two Section H (Class 1 and 10 buildings).

Volume Two contains the Performance Requirements and Verification Methods. The Housing Provisions contains the prescriptive numbers and methods (footings, slab depths, bracing, fire separation, balustrade dimensions, accessibility minimums). The two are read together.

Free PDF and online access on the ABCB website. Most builder, designer, and certifier compliance work happens here, not in the front of Volume Two.

Also known as: Housing Provisions, ABCB Housing Provisions 2022.

Category: Compliance & approvals.