material Materials and products 1 min read

Bolts for residential construction

Overview of structural bolts for Australian residential construction. Full coverage: M-series metric bolts, anchor bolts, hold-downs, coatings.

Ask Chalkline about this →

About this page

The full Chalkline reference article on structural bolts for Australian residential construction is at:

Bolts (M-series metric) for residential construction

That article covers:

  • M8 to M20 sizes and their common applications (hold-downs, post bases, structural steel, timber connections)
  • Property classes 4.6, 8.8, and 10.9 with minimum yield and tensile strengths per AS 4291.1:2015
  • Coating types: bare, electroplated zinc, hot-dip galvanised (AS/NZS 1214:2016), and stainless steel 316
  • Anchor bolt types: cast-in vs post-installed (mechanical and chemical) to AS 5216:2021
  • NCC 2022 Housing Provisions Part 6.3 minimum bolt sizes for light residential steel framing
  • Common site failures: uncoated bolts in concrete, wrong property class, short thread engagement
  • Working with concretors, chippies, and structural engineers
  • Supplier list (Ramset, Allfasteners, Simpson Strong-Tie, InfraBuild)

Go to the canonical article for the full reference.