Footing
the base of the structure transferring load to the ground.
Ask Chalkline about this →the base of the structure transferring load to the ground. Type depends on soil report.
Category: Structural.
Migrated from the seed glossary, 2026-05-02. Awaiting Dan’s review for “Why it matters” + “Common gotcha” expansion per WIKI-PLAN §3.6.