glossary Glossary 1 min read

Concretor

A concretor is a trade specialist who places, finishes, and cures concrete for slabs, footings, paths, and driveways in Australian residential construction.

Ask Chalkline about this →

A concretor is a trade contractor who places, compacts, finishes, and cures concrete. On residential projects the concretor typically takes responsibility for the full slab package: formwork set-up, reinforcement placement, ordering and receiving the concrete truck, screeding and trowelling the surface, and managing the curing period.

Concretors work alongside the structural engineer (who provides the slab design) and the certifier (who must sign off the pre-pour inspection before the pour can begin). Scope often includes footings, edge beams, paths, driveways, and suspended slabs where specified.

Also known as: Concrete contractor, concrete layer.

Category: Trades.

See also


Last updated: 2026-05-07. Verified: 2026-05-07. Quarterly review for currency.