Building and Energy (WA)
Building and Energy is the WA regulator administering the Building Act 2011, registering builders and surveyors, and overseeing the WA Home Indemnity scheme.
Ask Chalkline about this →Building and Energy is the WA state regulator for the building, plumbing, gasfitting, and electrical industries, operating as a division of the Department of Energy, Mines, Industry Regulation and Safety (DMIRS). It administers the Building Act 2011 (WA) and the Building Services (Registration) Act 2011 (WA), registers builders and building surveyors, oversees the WA Home Indemnity Insurance scheme, and enforces consumer protection under the Home Building Contracts Act 1991 (WA). Builder-facing: this is the regulator a WA builder reports to for registration, dispute handling, and Home Indemnity cover. Verified per DMIRS WA (2026-05-23).
What Building and Energy does
| Function | Detail |
|---|---|
| Builder and trade registration | Issues registrations for builders, painters, building surveyors, plumbers, gasfitters, and electricians |
| Building permit oversight | Administers the Building Act 2011 (WA) framework councils and private certifiers operate under |
| WA Home Indemnity scheme | Regulates the mandatory insurance for residential work over the threshold |
| Consumer dispute resolution | First-stop complaint pathway for owners against registered builders |
| Disciplinary action | Investigates conduct complaints; can suspend or cancel registration |
| Owner-builder approvals | Issues owner-builder approvals for work over the threshold |
| Plumbing and gasfitting licensing | Separate licences for plumbers and gasfitters across WA |
| Electrical licensing | Electrical contractor and worker licensing |
Builder registration in WA
Building and Energy administers the three WA builder classes:
| Class | Scope |
|---|---|
| Registered builder (practitioner) | Full residential and commercial work |
| Registered building contractor | A company holding a contractor registration with a nominated practitioner |
| Owner-builder | One-off approval for the owner to act as builder on their own home |
Practitioner registration requires:
- Demonstrated experience (typically 5 years supervised) and qualifications (Cert IV or higher).
- Financial requirements (positive net assets, no recent insolvency).
- Reputation (fit and proper person test).
- Application fee and ongoing annual renewal.
WA Home Indemnity Insurance
Mandatory for residential work over a threshold ($20,000 ex-GST at time of writing; check current value). Covers:
- Builder death, disappearance, or insolvency mid-project.
- Major structural defects post-handover (statutory warranty period).
- Refund of deposit if work doesn’t start.
Building and Energy approves the insurers offering the scheme; builders apply through approved insurers, not Building and Energy directly. Failure to take out Home Indemnity before work begins is a Building Act offence.
Dispute resolution pathway
| Stage | Mechanism |
|---|---|
| Negotiation | Owner and builder talk it through |
| Complaint to Building and Energy | Owner lodges; B&E investigates |
| Conciliation | B&E facilitates a resolution |
| State Administrative Tribunal (SAT) | If conciliation fails, formal hearing |
| Disciplinary action against registration | Separate B&E process against the builder personally |
Most disputes are resolved at conciliation. SAT is the appeal forum.
How Building and Energy fits with other WA bodies
| Body | Role |
|---|---|
| Building and Energy (this) | State regulator; registration, dispute resolution, scheme oversight |
| Local council building department | Building permit lodgement (some councils); building surveyor for state matters |
| Private building surveyors | Permit certification; report directly to B&E for registration |
| Energy and Water Ombudsman WA | Utility-related complaints (separate from B&E) |
| WorkSafe WA | Workplace safety oversight |
Building and Energy is the registration and scheme regulator; councils and private surveyors handle the actual permit work.
Builder reporting obligations
Builders must notify Building and Energy of:
- Insolvency events (within set timeframes).
- Major incidents on site (deaths, serious injuries, concurrent with WorkSafe).
- Specific events under the Building Act and Code of Conduct.
- Annual registration renewal with current insurance evidence.
Failure to report can lead to disciplinary action.
Cross-state equivalents
| State | Equivalent regulator |
|---|---|
| WA | Building and Energy (DMIRS) (this) |
| NSW | NSW Fair Trading + iCare for HBCF |
| VIC | Victorian Building Authority (VBA) |
| QLD | Queensland Building and Construction Commission (QBCC) |
| SA | Consumer and Business Services (CBS) |
| TAS | Consumer, Building and Occupational Services (CBOS) |
| NT | Building Practitioners Board NT |
| ACT | Access Canberra (ACT Planning and Land Authority for surveyors) |
Builder takeaway
- For a WA-based builder, Building and Energy is the regulator you renew with each year and the body you answer to in disputes.
- Home Indemnity Insurance is mandatory on residential work over the threshold; take it out before starting work, not after.
- Plumber, gasfitter, and electrician on your team need their own B&E (or related) licence; check before they start.
- Annual renewal lapses suspend the registration; work continued under a lapsed registration is unlawful.
Also known as
Building and Energy; B&E; Building Commission (former name); DMIRS Building and Energy.
Category: Regulation & licensing.
Related
See also
Last updated: 2026-05-23. Verified: 2026-05-23. Quarterly review for currency.