glossary Glossary 2 min read

Villaboard

Villaboard is James Hardie's fibre cement lining for wet areas: bathrooms, showers, laundries, splashbacks. 6 mm and 9 mm. Needs AS 3740 membrane before tiling.

Ask Chalkline about this →

Villaboard is the James Hardie brand name for a sanded-face fibre cement lining sheet designed for interior wet-area applications. It is manufactured from Portland cement, cellulose fibre, and silica aggregate, classified as Type B (internal or protected external use) under AS/NZS 2908.2:2000 (verified 2026-05-09). Villaboard is available in 6 mm and 9 mm thicknesses with sheet widths of 1200 mm and 1350 mm and lengths from 2400 mm to 3600 mm, sourced from James Hardie’s product page (verified 2026-05-09). It is used as the tile substrate in bathrooms, shower enclosures, laundries, and kitchen splashbacks. Villaboard itself is moisture-resistant but not waterproof: a membrane compliant with AS 3740-2021 (verified 2026-05-09) must be applied before tiling in any area classified as a wet zone under the NCC.

Also known as: Villaboard Lining; fibre cement lining; cement sheet (generic).

Category: Materials.

See also


Last updated: 2026-05-09. Verified: 2026-05-09. Quarterly review for currency.