Treated-sheet termite barrier

A treated-sheet termite barrier (Kordon, HomeGuard) is a physical sheet plus an embedded chemical active assessed under AS 3660.3 for termite resistance.

Ask Chalkline about this →

A treated-sheet termite barrier is the category of termite-management product that combines a physical sheet substrate with an embedded chemical active. The two flagship Australian products are Kordon (deltamethrin-impregnated) and HomeGuard (bifenthrin-impregnated). Both are assessed under AS 3660.3 and certified through CodeMark.

Why “treated-sheet” is a category

AS 3660.1 groups termite-barrier systems into three families:

  1. Physical barriers: stainless mesh (Termimesh), graded stone (Granitgard), reinforced concrete slab edge. No chemistry.
  2. Chemical barriers: soil-applied actives (fipronil, imidacloprid, bifenthrin), no physical layer.
  3. Treated-sheet barriers: combination of a physical sheet plus an embedded chemical active. Belt-and-braces.

Treated-sheet sits in the third family because it relies on both:

  • The physical sheet (HDPE film or laminate) presents a continuous skin termites must penetrate.
  • The chemical active is the deterrent that stops them attempting penetration in the first place.

If a termite finds a fold, tear, or untaped edge in the sheet, the active concentration at the gap is the second line of defence.

Common AU products

ProductActiveCarrier
KordonDeltamethrin (synthetic pyrethroid)HDPE film
HomeGuardBifenthrin (synthetic pyrethroid)Polymer film + foil laminate

Both are CodeMark-certified for AS 3660.3 compliance. Both are installed at slab-prep stage or as penetration sleeves.

Where treated-sheet sits

The product family is used for:

  • Perimeter strip along the slab edge (continuous run).
  • Penetration collars around plumbing and conduit through the slab.
  • Construction joints between slab pours.
  • Cold-joint detailing at slab-to-wall transitions.

Treated-sheet is rarely the only termite-management measure on a building; it pairs with a chemical soil treatment or a perimeter inspection zone for full AS 3660 compliance.

For a builder

  • Order to slab program. Sheet goes in pre-pour; missed window = re-spec entire system.
  • Detail install matters. Overlaps, tape, penetration cuffs all per manufacturer instructions: these aren’t generic; they’re the certification basis.
  • Get the installer’s certificate. CodeMark certification is for product + install method. An ad-hoc install voids it.
  • Brief owner on inspection routine. Treated-sheet is one layer; the AS 3660.2 annual inspection regime is separate.

Category: Termite management.