Risk assessment (WHS)

Risk assessment is a written WHS exercise: identify hazards, evaluate likelihood and consequence, apply hierarchy of controls. Mandatory before HRCW, asbestos, CSE.

Ask Chalkline about this →

A risk assessment in WHS is a written exercise that identifies hazards, evaluates the likelihood and consequence of harm, and specifies controls to eliminate or reduce the risk to as low as reasonably practicable (ALARP). It is mandated under the Model WHS Regulations 2011 (Part 3.1) for any high-risk construction work (HRCW), manual handling task, asbestos removal, confined space entry, or any other named hazardous activity. The risk assessment is the direct precursor and information source for any Safe Work Method Statement (SWMS), entry permit, or control measure.

The four-step process (AS/NZS ISO 31000:2018 framework):

StepActivityOutput
1. Identify hazardsWalk the site; review past incidents; consult workersHazard register: each named hazard
2. Evaluate the riskScore likelihood (1-5) and consequence (1-5); product is the risk scoreRisk matrix entry per hazard
3. Apply controlsUse the hierarchy (see below) to reduce the riskControl list, residual risk score
4. ReviewRe-assess after changes, after incidents, periodicallyUpdated risk assessment

The hierarchy of controls (most-effective to least-effective):

LevelControl typeExample
1. EliminateRemove the hazard entirelyUse prefab structures so no working at height; pre-coat steel offsite to remove paint hazard at height
2. SubstituteReplace with a less-hazardous alternativeWater-based instead of solvent-based coating
3. IsolatePhysical barrier between worker and hazardHoarding around demolition; perimeter fencing
4. EngineeringEngineered control reducing exposureLocal exhaust ventilation for silica dust; guards on machinery
5. AdministrativeProcedure, training, supervision, rotationHot work permit, lockout/tagout, work-rest cycles
6. PPEPersonal protective equipmentHard hat, safety boots, respirator, harness

PPE is the last resort, not the first. A risk assessment that jumps straight to “PPE: respirator” without considering elimination, substitution, isolation, or engineering controls is non-compliant with WHS principles.

Risk scoring (typical 5x5 matrix):

Insignificant (1)Minor (2)Moderate (3)Major (4)Catastrophic (5)
Almost certain (5)510152025
Likely (4)48121620
Possible (3)3691215
Unlikely (2)246810
Rare (1)12345
ScoreRisk levelAction
1-4LowMonitor; standard controls
5-9ModerateSpecific controls required
10-14HighImmediate action plan
15-25ExtremeCease activity until controlled

When a risk assessment is mandatory:

  • All high-risk construction work (HRCW) under WHS Reg s.291 (falling from height, plant, asbestos, refractory ceramic fibre, asbestos, demolition, structural alterations affecting stability, etc.).
  • Hazardous chemicals above thresholds.
  • Manual handling with specific risk factors.
  • Confined space entry (precursor to the entry permit).
  • Plant and equipment before commissioning.
  • Any new task or changed task introducing new hazards.

Relationship to the SWMS:

The risk assessment is internal to the workplace (the PCBU’s safety system). The SWMS is task-specific and worker-facing (the document that tells the worker how to do the job safely). The SWMS is built from the risk assessment, but the two are distinct documents. A SWMS without a risk assessment behind it is a checklist; a risk assessment without a SWMS isn’t actionable on-site.

Common defects:

  • Generic risk assessment lifted from a template without site-specific adaptation. The template is a starting point, not the finished assessment.
  • Skipping the hierarchy of controls and going straight to PPE.
  • Failing to consult workers during identification of hazards. Frontline workers spot hazards office-based assessors miss.
  • Static document filed in a binder, never reviewed after incidents or changes.
  • Risk score manipulated to fit a desired outcome (the “we always score this as Moderate” trap).

Also known as: WHS risk assessment; safety risk assessment; HRCW risk assessment; pre-task risk assessment.

Category: WHS.