R30 (WA R-Code)
R30 is a WA Residential Design Code: 30 dwellings per hectare, 350 m2 min lot for single dwellings, 0.5 plot ratio grouped. Standard suburban Perth code.
Ask Chalkline about this →R30 is a WA Residential Design Code (R-Code) designation indicating an approximate residential density of 30 dwellings per hectare (one dwelling per ~333 m² average). It is the standard suburban-Perth density and the baseline most residential lots sit on. The R-Code drives lot size, plot ratio, setbacks, and open-space requirements under State Planning Policy 7.3 (R-Codes Vol 1).
What R30 sets
| Control | R30 figure |
|---|---|
| Density | ~30 dwellings/ha (1 dwelling per ~333 m²) |
| Single-dwelling minimum lot | 350 m² |
| Grouped-dwelling plot ratio | 0.5 |
| Open space | Per R-Codes Vol 1 Table 1 |
| Setbacks | Per R-Codes Vol 1 (street, side, rear) |
(Verified 2026-05-29 against R-Codes Vol 1.)
R-Code ladder
R-Codes run R2 (rural-residential) through R10, R20, R25, R30, R40, R60, R80, R100, R160, R-AC. Each step roughly doubles density. R30 = suburban; R40 = medium density (dual occ); R60+ = infill/townhouse.
A lot’s R-Code is set by the Local Planning Scheme map. Split codes (e.g. R20/R30) apply if specific conditions are met.
Two compliance pathways
Deemed-to-comply (lot size, setbacks, plot ratio) is the fast path. The design-principle pathway is discretionary, assessed against neighbourhood character and amenity, and takes longer.
For a builder
- Check the R-Code on the LPS map before pricing. Splits and rezoning change the answer.
- R30 vs R40 changes everything. Suburban vs medium density is a major scope shift.
- Deemed-to-comply is the fast path. Design-principle adds months and cost.
Category: Planning / WA R-Codes.