glossary Glossary 1 min read

Performance Solution

A Performance Solution is the NCC alternative compliance pathway: an expert report shows the design meets the Performance Requirement without using DTS.

Ask Chalkline about this →

The non-DTS NCC compliance pathway. An engineer, fire-safety consultant, or other suitably qualified professional prepares a report showing the design meets the relevant Performance Requirement by means other than the Deemed-to-Satisfy Provisions.

Performance Solutions are normal and legal under NCC 2022 Part A2 (Governing Requirements). The certifier (PCA) reviews the report and accepts or rejects it.

Use cases: heritage retrofits where DTS is impossible, awkward sites, complex fire scenarios, novel materials, or where the DTS path is more expensive than a one-off engineered solution.

Cost typically lands on the project budget for the consultant report, certifier review, and any peer review the certifier requests.

Also known as: Alternative Solution (older NCC editions), performance-based design.

Category: Compliance & approvals.