glossary Glossary 1 min read

HIA Guide to Standards and Tolerances (correction, see HIA Guide to Materials and Workmanship)

The HIA's national workmanship guide is correctly called the HIA Guide to Materials and Workmanship. State-issued guides are called Guide to Standards and Tolerances.

Ask Chalkline about this →

Common misnaming. The national HIA workmanship guide is correctly called the HIA Guide to Materials and Workmanship. See HIA Guide to Materials and Workmanship.

Each Australian state regulator publishes its own Guide to Standards and Tolerances (the VBA Guide to Standards and Tolerances, the NSW Fair Trading Guide to Standards and Tolerances, the QBCC Standards and Tolerances Guide, etc.). Those state guides are different documents with similar purposes.

Category: Quality & inspection.