glossary Glossary 3 min read

Differential movement (footings)

Differential movement is the structural defect where one part of a footing rises or settles relative to another. The primary failure AS 2870 footing designs resist.

Ask Chalkline about this →

Differential movement is the structural defect mechanism in which one part of a building’s footing moves vertically relative to another part, causing twisting and racking forces in the building above. On a reactive site, the south end of a slab might rise 30 mm in winter (wet) and the north end stay flat, producing 30 mm of differential between the two. The wall above the moving end cracks; doors stick; tiles crack along the line of maximum differential.

Differential movement is the primary structural failure mode that AS 2870:2011 footing designs are engineered to resist. The standard’s deemed-to-comply tables, site classification by characteristic surface movement (ys), and beam-and-mesh detailing all exist to keep differential movement within tolerance.

The two main causes:

  1. Reactive soil under part of the building. A site with non-uniform soil profile (clay one half, sand the other) reacts differently to moisture change. The clay portion swells in winter, the sand portion does not.
  2. Non-uniform load. A point load (a steel column on a pad footing) settles into reactive soil at a rate different from a distributed-load wall on strip footings. Even on uniform soil, the load difference creates differential.

Common visible symptoms (the defect chain):

  • Hairline cracks in masonry walls, typically running diagonally from corners of openings.
  • Cracks in plasterboard at internal corners and door head heights.
  • Doors that bind on the frame in one season and open clear in another.
  • Floor tiles cracking along a continuous line.
  • Cornice gaps appearing seasonally between wall and ceiling.

How AS 2870 resists it:

  • Stiffened raft slabs distribute load across a large area: a 5,000 ys reactive site under one corner is averaged across the whole slab footprint.
  • Articulation joints in masonry walls let two segments move independently without cracking the masonry.
  • Beam-and-mesh in stiffened rafts gives the slab tensile strength to bridge a soft spot.
  • Edge thickening at the perimeter resists corner heave.

Builder action:

  • Read the engineer’s site classification and slab design before site-start. The slab will not accept on-site modifications.
  • Maintain drainage around the perimeter post-build: poor drainage adds water to the reactive zone and worsens movement.
  • Educate the owner about gardening near the building: planting thirsty trees within 1 to 3 m of a footing extracts moisture in summer and worsens the cycle.
  • Where differential movement appears within the warranty period, document it photographically, measure it at the worst point, and engage an engineer to re-assess before patching cracks.

Also known as: differential settlement; differential heave; non-uniform foundation movement.