Buildability

Buildability (constructability) is how practically, safely and economically a design can be built with available trades and methods, a risk the builder prices in.

Ask Chalkline about this →

Buildability (also called constructability) is the degree to which a design can actually be built: practically, safely and economically, with the trades, materials and methods available. A design can satisfy the code and still be hard to build. Buildability is the gap between “it is drawn” and “it can be put together on a real site without fighting the documents”.

It is a risk the builder carries, especially on design-and-construct work where the builder takes on the design and prices a lump sum against it. Poor buildability shows up as details that cannot be sequenced, tolerances no trade can hold, access that will not let the plant or people in, or specified products that are not available.

What a buildability review looks for:

  • Sequence: can the trades follow each other without undoing earlier work?
  • Access and tolerance: can people, plant and materials reach the work, and can the detail be built to the tolerance drawn?
  • Availability: are the specified products and trades actually obtainable?
  • Safety: can it be built without forcing an unsafe method, such as working at height with no anchor?
  • Cost: is there a simpler detail that achieves the same result for less?

Builders run a buildability review against the documents before pricing, much as due diligence is run over a site. Catching a poorly buildable detail early (a complex membrane roof junction, say) is far cheaper than finding it mid-build. Where a design is novated to the builder, the buildability risk transfers with it, so the review matters even more.

Also known as: Constructability, build-ability.

Category: Concept / Design.